Digital Foreman Suite

Change Order

DRAFT
Company Logo (PNG or JPG · prints on PDF) PRO

PDF Branding PRO — your style and color on every PDF, across all three apps

ACCENT COLOR
LIVE PREVIEW — this is your actual PDF header

Changes save instantly and style the PDFs in all three DFS apps on this device. On a computer you get a full-page preview — the fun way to build your letterhead.

Saved settings load automatically every time you open the app on this device.

Rate Card — for Time & Materials change orders. Saves as you type.

Labor tiers — name + hourly rate

Materials

Contractor fee

%

Prints as its own labeled line above tax on every T&M final bill — never folded into the rates. Waive it on any single CO with one tap.

Fixed-price CO settings — unchanged

Markup:  ·  Local tax:

These belong to fixed-price change orders and still work exactly as before — markup adjusts on each CO, tax comes from the Local Tax Rate field above.

Backup & Restore (settings, logo, saved items, CO log)

Save the backup file anywhere you trust. A new phone restores everything in one tap — nothing ever leaves your device otherwise.

How is this change billed?

Time & Materials: the customer signs the rates and terms before the work, and the hours and receipts are tallied on the final bill.

1 · Client & Job Site

Your company info and logo come from Business Settings above — no retyping.

2 · Change Description

Quick insert

3 · Line Items & Pricing

Subtotal $0.00
Markup
%
$0.00
Tax (from Settings)
%
$0.00
Grand Total $0.00

4 · Schedule Impact

Days added to project timeline

0

Substantial completion date shifts by this many calendar days upon approval.

5 · Approval & Signatures

By signing below, the Client authorizes the work described in this Change Order, agrees to the Grand Total shown above as an adjustment to the contract price, and accepts the stated schedule impact. This Change Order becomes part of the original construction agreement.

Client Signature
Contractor Signature

Sign with a finger or stylus. The page will not scroll while signing.

No change orders saved yet. Every CO is logged here automatically the moment you generate its PDF.

What is a change order?

A change order is the written record of work that got added or changed after you and your customer agreed on the job. It lays out what the extra work is, what it costs, and what it does to the schedule — and both of you sign it. Written down and signed before the work starts, everybody knows what was agreed to, and good work gets paid for.

Most guys have used a paper change order form or a change order template out of a binder. This app is that form, built for your phone. It numbers each one for you, runs your markup and local tax automatically, and both parties sign right on the screen with a finger. One tap turns it into a clean, professional PDF you can text or email before you pick the next tool up.

Free to use, works with zero signal, and everything you enter stays on your own device.

Watch: signed on the spot

01 · Most Important

Why does my CO log only show one entry even after multiple jobs?

Every change order gets its own unique number. You must tap RESET / NEW CO between jobs — that increments the number from -001 to -002 and so on. If you skip RESET and fill in a new job over the old one, both COs share the same number and the log updates the first entry instead of adding a new one. Think of RESET as "tearing off the old form."

02 · Workflow

What's the difference between REOPEN and DUPLICATE?

REOPEN loads the exact CO back — same number, same date, same signatures — so you can add the client signature later and regenerate a SIGNED version. DUPLICATE copies all the line items and description into a brand-new CO number with blank signatures. Use it for repeat work at the same property or for a similar job with a different client.

03 · Signatures

My client wasn't on site. How do I get their signature later?

Generate the PDF now — it saves as a DRAFT with a watermark. Send it to the client however you like. When they're ready to sign in person, scroll down to the Change Order Log, tap REOPEN on that CO, have them sign the Client Signature pad, then tap GENERATE PDF again. The new PDF will say SIGNED, the watermark disappears, and the log entry updates automatically.

04 · Saved Items

How do I save a line item for reuse?

Fill in the item description and unit cost, then tap the ☆ star button on that row. It saves instantly and appears as an orange chip below the ADD LINE ITEM button. On any future CO, tap the chip and it drops into a new line item with qty 1. Tap Edit next to "Saved items" to delete any you no longer need.

05 · Your Data

Is my data safe if I get a new phone?

Everything — settings, logo, saved items, and your full CO history — lives only on your device. To move it to a new phone, open Business Settings, tap DOWNLOAD BACKUP, and save the file to your cloud storage or email it to yourself. On the new phone, open the app, go to Business Settings, tap RESTORE BACKUP, and select that file. Done. Nothing ever passes through any server.

06 · Offline Use

Does this work with no cell service?

Yes — 100%. Once the app has loaded on your device, it works in concrete basements, metal buildings, and dead zones. All calculations, PDF generation, and saving happen entirely on your phone. No internet connection is ever required to use the app.

07 · Pro License

I bought Pro — what happens if I get a new phone or lose this one?

Your Pro license key is emailed to you by Gumroad the moment you buy. It's tied to you, not the device — so if you replace or lose your phone, just install the app on the new one, open Business Settings, tap ACTIVATE LICENSE KEY, and paste the same key. Your logo and Pro features come right back. Keep that Gumroad email (or jot the key somewhere safe) — it's your proof of purchase. Note: your change orders, settings, and saved items move over separately with DOWNLOAD / RESTORE BACKUP (see "Is my data safe if I get a new phone?" above) — the key restores Pro, the backup restores your data.

Found a bug or have a feature request?

Tap below to send an email with your device info pre-filled. The more detail the better — screenshots help a lot.

Opens your email app · hello@digitalforemansuite.com

★ Like the app? Leave a quick review

A line about how it helped on the job means a lot — and helps other contractors find it.

★ LEAVE A REVIEW

Opens your email app · hello@digitalforemansuite.com

🎨 Design your letterhead — free

Put your logo and colors on a real change order and see exactly how it looks before you decide anything. No logo yet? The logo maker builds one in about two minutes — free, no account.

🎨 DESIGN MY LETTERHEAD MAKE A LOGO

Both free · nothing to sign up for · your design saves to this device